top of page
CAPEX & New Production Line
€25M Production Line Transformation — Sugar Reduction, Workforce Efficiency and Zero-Defect Quality
Sector:
Food Manufacturing
Scope:
End-to-End CAPEX Project Management, Commissioning & Start-up
The Challenge
A food manufacturing facility wants to change the strategic, aligning with consumer preferences, but the existing production line was not capable of delivering the new recipes without significant quality and safety risks.
A SWOT analysis of the site and market confirmed the opportunity and defined the investment case: a full production line transformation with a maximum budget of €25M. The objectives were ambitious and non-negotiable:
• Produce new sugar-free, high-fibre recipes at industrial scale with full quality and food safety compliance
• Reduce workforce dependency by 25% through automation and process modernisation
• Reduce unplanned stoppages by 10%
• Increase asset intensity by 15%
• Reduce energy consumption by a minimum of 10%
Our Approach
As End-to-End Project Manager, we led every phase of the project from initial research through to full operational handover — a role that combined technical depth with commercial and strategic coordination.
• Research & Development phase: Led the technical investigation to define the optimal process solution for the new recipes, validating the technology against quality, safety and cost requirements
• Partner selection: Identified and selected the best equipment supplier through a structured evaluation process — balancing technical capability, delivery reliability and total cost of ownership
• Engineering & construction: Coordinated the building specifications and construction workstream alongside the equipment project team
• Factory Acceptance Testing (FAT): Conducted full FAT at the supplier's facility to validate equipment performance before shipment
• Installation & commissioning: Managed on-site installation and led the full commissioning process
• Start-up & optimisation: Drove the operational ramp-up, process optimisation and full team training — ensuring the site team had the capability to sustain performance independently after handover
The Results
Metric | Target | Achieved
Budget | €25M maximum | Delivered within budget
Workforce reduction | -25% |✓
Unplanned stoppages | -10% |✓
Asset intensity |+15% |✓
Energy consumption | -10% minimum |✓
New recipe capability | Sugar-free + high fibre | Full production achieved
Food safety & quality | Zero compromise |✓
"The most complex projects are not the ones with the biggest budgets — they are the ones where technology, people and process change all happen at the same time. Getting all three right is what defines a successful delivery."

01
CAPEX & New Production Line
No media to show yet
Add media to this gallery, or connect to data.