From Manual Cleaning to Full CIP Automation — 75% Reduction in Cleaning Time and 65% Water Saving in Food Manufacturing Line
Sector
Food Manufacturing
Scope
CIP System Design, Piping Optimisation, Process Automation, Chemical Handling, Commissioning & Training
The Challenge
A leading food manufacturing facility was operating without a proper Clean-In-Place system. What existed was a rudimentary setup, a single caustic dissolution tank repurposed for both acid and alkali preparation, shared between circuits that had never been designed for systematic cleaning. The consequences were significant:
• No dedicated CIP station — cleaning cycles were manual, inconsistent and entirely dependent on operator execution
• Piping network with multiple diameter variations and no proper flow velocity control — making turbulent flow impossible to guarantee across all circuits
• Inadequate temperature and conductivity monitoring — no reliable validation that cleaning parameters were being achieved
• No water or chemical recovery of any kind — every CIP cycle consumed full volumes of fresh water and chemicals with zero reuse
• Manual concentrated chemical handling — operators physically mixing chemicals, with associated safety, consistency and traceability risks
• Cleaning quality dependent on operator execution rather than process control — variable results and no systematic cycle-by-cycle validation
The facility needed not a repair of what existed, but a complete rethink — from piping layout to automation to chemical management.
Our Approach
We approached this as a full system design project, working from the product contact surfaces outward — ensuring that every cleaning decision was driven by the four T's of CIP science: Temperature, Titration, Turbulence and Time.
Phase 1 — Product Line Redesign and Circuit Definition
Before designing the CIP station, the product piping network required fundamental changes. The existing layout had multiple pipe diameter variations that made consistent flow velocity — and therefore turbulence — impossible to achieve across all circuits:
• Piping network redesigned and standardised — uniform diameters ensuring correct flow velocity and guaranteed turbulence across all product contact surfaces
• Block-block-bleed valve arrangements implemented at all critical points — enabling independent circuit isolation and allowing multiple CIP circuits to operate simultaneously without cross-contamination risk
• Piping and tank circuits separated — enabling dedicated cleaning programmes optimised for each type of surface, volume and geometry
Phase 2 — CIP Station Design
With the product network prepared, we designed a purpose-built CIP station with four dedicated tanks:
• Clean water tank — fresh rinse water supply for cycle initiation
• Recovery water tank — captures the final rinse from one CIP cycle for reuse as the pre-rinse of the next, delivering the 65% water consumption reduction
• Caustic tank — heated, thermally insulated, with automated concentration control
• Acid tank — heated, thermally insulated, with automated concentration control
The station was equipped with two independent pumps and two supply lines, enabling two full CIP cycles to run simultaneously. Chemical tanks were designed with closed heating circuits, full thermal insulation and electric heating — eliminating any steam dependency and ensuring zero CO₂ impact in line with the facility's sustainability commitments.
All four tanks were dimensioned at 33% above the volume required for two simultaneous CIPs — providing built-in capacity for future line expansion. The structural installation was pre-designed to accommodate a third CIP line without additional civil works.
Phase 3 — Chemical Handling and Safety
Concentrated chemical handling was redesigned from the ground up with a fully dedicated, enclosed installation:
• Containment bunds around all concentrated chemical storage areas
• Automated dosing system — operators connect a flexible hose and open the container outlet valve; all dilution, concentration control and tank management is handled automatically
• Inline conductivity and temperature sensors providing continuous real-time validation of chemical concentration throughout every cleaning cycle
• All four T's monitored and logged automatically — Temperature, Titration, Turbulence and Time — with full traceability for every cycle
Phase 4 — Commissioning and the Fifth T: Training the People
Following full installation and commissioning — validating all sensors, flow rates, temperatures and concentration controls under real production conditions — we completed what we consider the most critical phase of any automation project: Training the People.
Even in a fully automatic installation, the team must understand how the system works, what the alarms mean, what correct looks like and when to escalate. Operators, technicians and maintenance personnel were trained on the full system — not just the HMI, but the underlying principles of CIP science that the automation is designed to deliver. This fifth T is what transforms a well-designed system into a sustainably performing one.
The Results
BEFORE
CIP water consumption — Baseline
Cleaning cycle time — Baseline
Labour for cleaning — Manual preparation and execution
Cleaning quality validation — Cycle-by-cycle sampling required
Simultaneous CIP capability — 1 circuit at a time
Chemical handling safety — Manual mixing by operators
CO₂ impact of CIP system — Steam-dependent
Future expansion — No headroom
----------------------------------------------------------------------------------------------
AFTER
CIP water consumption — −65%
Cleaning cycle time — −75%
Labour for cleaning — Zero — fully automatic
Cleaning quality validation — Quarterly validation only
Simultaneous CIP capability — 2 circuits simultaneously
Chemical handling safety — Fully enclosed, automated dosing
CO₂ impact of CIP system — Zero — electric heating only
Future expansion — +33% capacity + 3rd line pre-installed
----------------------------------------------------------------------------------------------
"A CIP system is only as good as the process it was designed to clean. Before designing the station, we redesigned the line. The 4 T's define the science — the 5th T, Training the People, is what makes the results last."

01